刘东煤矿混合井冻结法施工的工程地质论证
APPROACHMENT TO THE ENGINEERING GEOLOGY ABOUT THE FREEZING PROCESS OF A SKIP ̄COMBINATION SHAFT IN LIUDONG COAL MINE

许惠德
Xu Huide(College of Mineral Resource and Environmental Science;

摘要(Abstract):

在岩性分析、动水压力分析、地压分析、井筒周边稳定预测、模糊聚类分析和数值模拟的综合研究基础上,对刘东煤矿混合立井冻结法施工的适宜性,冻结深度的合理性进行了工程地质论证,取得了十分显著的经济效益。
fter comprehensive resealches on the lithological characters of the test hole,dynamic pressure,geostatic pressure,stability prognosis around the well,fuzzy cluster analysis and mathematic analog,thewriter gave the engineering geological demonstration on the suitability of freezing process and the rationality of freezing depth of the skip--combination shaft in Liudong coal mine,which brought about notable economicresults.

关键词(KeyWords): 冻结法施工,混合井,工程地质性质,方案论证
freezing process $skip-combination shaft;property of engineering geology;project approachment

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 许惠德
Xu Huide(College of Mineral Resource and Environmental Science;

文章评论(Comment):

序号(No.) 时间(Time) 反馈人(User) 邮箱(Email) 标题(Title) 内容(Content)
反馈人(User) 邮箱地址(Email)
反馈标题(Title)
反馈内容(Content)
扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享