利用预测型线性规划评价矿区地下水开采量APPRAISAL ON EXTRACTION OUTPUT OF THE GROUND WATER IN A CERTAIN COAL MINING AREA BY APPLICATION OF THE PREDICTED LINEAR PROGRAMMING
曹丁涛
Cao Dingtao (Yanzhow Coal Mining Bureau);
摘要(Abstract):
建立了某矿区水源地当前和未来不同时期地下水开采量评价的预测型线性规划模型,得到了不同时期的最大开采量及相应的最优运行方案,为矿区发展规划提供了决策依据。
A predicted linear programming model is set up for the appraisal on extraction output of theground water in the water-source zone of a certain coal mining area,both for the present and the differentstages in future.The maximum extractions in different stages can be derived from this model and an optimalprogramme can be prepared accordingly to form the basis for decision-making in the development of the coalmining district.
关键词(KeyWords):
预测型线性规划;数学模型;地下水储量;评价
predicted linear programming;mathematical models;groundwater storage;evaluation
基金项目(Foundation):
作者(Authors):
曹丁涛
Cao Dingtao (Yanzhow Coal Mining Bureau);
参考文献(References):
文章评论(Comment):
|
||||||||||||||||||
|