在现场调研、工程地质勘察和应力分析基础上,研究了在建的十漫高速公路火车岭隧道施工中出现的大变形问题。结果表明,导致大变形发生的原因主要是岩性、偏压和两郧断裂构造作用等。大变形治理及后续开挖施工时,不能依赖围岩的自承能力,必须增加初期支护的强度和刚度,增大预留变形量,同时及时进行二次衬砌来承担部分荷载,特殊地段可进行适当的地表治理。实践证明,整治后的大变形由最大1.6 m降低到不足20 mm,治理措施同时适用于十漫沿线其他大跨度公路隧道大变形问题。
Based on the field investigation,engineering geological exploration and stress analysis,the large deformation of Huocheling tunnel is studied.The large deformation is mainly due to rock properties,unsymmetrical load and tectonic effect of the Yunxi-Yunxian fault.The methods adopted treat it were enhancing the rigidity and strength of primary support system,increasing the perform deformation,completing the secondary lining in time,and carrying out the necessary remediation on the ground surface of specially region.The results showed that the large deformation reduced from 1600 mm to less-than 20 mm after remediation and the control strategy is applicable to the surrounding rock influenced by Yunxi-Yunxian fault.
关键词(KeyWords):
两郧断裂;大变形;软岩隧道;治理
Yunxi-Yunxian fault;large deformation;soft rock tunnel;control
基金项目(Foundation):
作者(Author):
罗学东,陈建平,范建海,左昌群
LUO Xue-dong~1,CHEN Jian-ping~1,FAN Jian-hai~2,ZUO Chang-qun~1(1.Engineering Faculty
参考文献(References):
- [1]姜云,李永林,李天斌,等.隧道工程围岩大变形类型与机制研究[J].地质灾害与环境保护,2004(4),46-51.
- [2]Kimura F,Okabayashi N,Kavamoto T.Tunneling through squeezingrock in two Large fault,Zone of Enasan Tunnel II[J].Rock Mechanicsand Rock Engineering,1987(20):151-166.
- [3]王科.家竹箐隧道地质条件及地应力特征[J].世界隧道,1998(1):11-16.
- [4]袁照令,李大明.秦豫地区高精度航磁资料研究成果[J].地球科学—中国地质大学学报,1991,16(4):437-444.
- [5]曾云.湖北武当—两郧地区地质构造基本特征及构造演化[J].华南地质与矿产,1998(2):60-66.
- [6]张咸恭,李智毅,郑达辉,等.专门工程地质学[M].地质出版社(北京),1988.
- [7]王成,邓安福.钢管推力桩桩土参数的确定方法[J].重庆建筑大学学报,1997,19(6):58-62.
- [8]王成.钻孔灌注推力桩桩力土参数取值范围的研究[J].岩土工程学报,1993,15(3):101-105.